Opened on February 4, 2022, the Beijing Winter Olympics reached an unprecedented level of digitalization in the history of the Winter Games. However, computing power centers and data centers consume large amounts of electricity, creating an urgent need to increase energy efficiency, reduce electricity bills, and promote sustainability. Under such circumstances, the ultra-low energy loss performance of CEEG amorphous alloy dry-type transformers won the organizers' favor. These transformers contributed significantly to holding a green, low-carbon Olympic event.


Beijing Winter Olympics venue

  

The Beijing 2008 Summer Olympics, the first Olympics hosted by China, received the highest level of national attention and preparation. The Beijing Olympic Traffic Command Center ensured top-tier traffic management during and after the games, placing great emphasis on the quality and stability of the electrical equipment it procured. The center purchased several CEEG SCB10-1600/10 epoxy dry-type transformers. These transformers not only ensured the heavy traffic flow near Olympic venues went smooth, but have been operating reliably until today. The product quality and service have received high praise from users.


 Beijing Olympic Traffic Command Center


The National Olympic Sports Center Comprehensive Training Hall served as the training base for the national men's and women's tennis and wrestling teams during the 2008 Beijing Olympics. During the games, it hosted gymnastics, trampoline, and handball events, and now stands as a premier sports facility in Beijing. For this project, multiple CEEG SG10-800/10 dry-type transformers were selected, earning high praise from technical experts for their performance. The project's experts especially commended our transformers for their exceptional noise control and the use of NOMEX insulation technology.  


comprehensive training hall


CEEG proudly supplied multiple SCB cast resin dry-type transformers to the Beijing Wukesong Sports Center, the venue for basketball and other events during the 2008 Olympic Games. Our transformers stood out among numerous competitors for their superior performance, exceeding national standards and reaching international levels in several key areas.


Wukesong Stadium


The 29th Olympic Games Qingdao Olympic Sailing Center is a key national Olympic project built on the former site of the Beihai Shipyard. Covering a total area of 45 hectares, with 30 hectares dedicated to the Olympic events, the project had extremely stringent procurement standards, especially for power equipment like transformers. After thorough evaluation by technical experts, CEEG was selected to supply multiple YB-800/10 prefabricated unit substations and SC10-50/6 transformers. We are proud to contribute to this world-class sailing center with our reliable and advanced power solutions.


YB800 SC


CEEG's YB-500/10 prefabricated substations were selected for the National Olympic Doping Control Center, the largest and most advanced doping control laboratory in Asia. This world-class facility handled doping tests for the 2008 Beijing Olympics and the national team's training preparations. Our substation stood out among competitors for its exceptional integration and ease of maintenance, playing a vital role in ensuring the integrity of sports.


YB500




Related Posts

content is empty!

Telephone

+86-17826020132
FOLLOW US

PRODUCTS

QUICK LINKS

CONTACT US
​Copyright © 2024 CEEG Nanjing Transmission & Distribution Equipment Co., Ltd. | Sitemap | Privacy Policy